News · 5 November 2026
Write the serial number down before this goes in.
Then you'll always know which element sits where, and what it tested at.

That's an 8 inch element going into a pressure vessel at our plant in Ras Al Khaimah.
It's lifted by hand, gloves on.
Our loading guide starts before anybody lifts anything.
Draw the skid first: every vessel, every element position.
Then stage the elements and record each serial number by position.
Why bother?
Every regenerated element has its own flow and rejection figures, logged against its serial number.
That diagram ties each position in your rack to its own test data.
Then the loading itself.
Always load from the feed end of the vessel.
Check the brine seal sits in its groove, with the opening upstream.
Put a thin layer of silicone lubricant on each brine seal.
It stays in the vessel while the system runs, and that makes removal much easier.
Hold the next element so its weight doesn't rest on the interconnector.
And load just before start-up.
Your vessel maker's drawing still decides how the end cap assembly goes on and off.
If you've got a rack to reload, start with the cost: 2ndlifero.com/loading
First posted on our LinkedIn page.